For the solution of installing hanging sliding door
2013-03-26 20:46:31
Hanging sliding doors without rails are ideal for old people and children in families. The lifting rail sliding door is divided into two types: portable lifting rail door: it is characterized by convenient push and pull, and style diversification, but also can be designed according to their own needs common styles of doors, door material door and other ordinary door has been completely. Heavy lift rail sliding door: this door is characterized by the door frame and door panels are thick, and sturdy and durable, the overall effect is very good. Grade is also superior to ordinary wooden doors.
In the installation of hanging rail sliding door, the need to pay attention to: first, to ensure that the width of the two doors must be consistent, and relatively small space before and after, do not consider installing hanging rail sliding door. Before installation, you need to choose a better quality of the door, so that the use of time can be extended for a long time, good quality, good protection. There is also a need to pay attention to that is, in the installation, pay attention to noise control, so as not to disturb other people around.
At the time of installation, the first thing we should do is to prepare the materials needed for a top rail, a pulley, an elevator, a rotatable screw shaft, a screw, and a door. Moreover, the main frame of the whole door frame has been completed, and has passed the acceptance check, and the reserved openings and side decorations have been roughly completed. We decided that the purpose of this was to avoid repeated construction later, which was laborious and costly.
First of all, the elevation is located on the datum line we reserved in advance, and the elevation and the position of the hole are clearly defined. Then, in accordance with the drawings on the design of the hole for simple construction, so as not to leave the installation blank. Then start the installation of lifting rail: one by one check for the sliding door of the required components, and then used to steel cap is fixed in the roof of 500mm wood frame installed, and will be fixed in the roof bolt, check the size of rail mounted on the board, then check the installation of crane, the nut is fixed.
Then the top rail is arranged in the pulley cover, mounted on the elevator, do the appropriate level adjustment, until it reaches the requirements. Finally the two doors installed, installed supporting hardware accessories, observe the opening and closing is smooth, without any resistance and tilt, and then all the fixed bolt and screw, the installation process is complete. Attention should be paid to, in the installation process will be on both sides of the door crack adjustment, or will make the whole hanging rail sliding door uncoordinated.